箱式变压器选点多数在居民核心区和道路两旁

网址:www.diteLi.com.cn  2019-05-29  作者:admin    阅读:

其一,箱式变压器选点多数在居民核心区和道路两旁,施工产生的噪音及粉尘污染,会对城市环境及居民正常生活造成一定影响;
Firstly, most of the box transformer locations are located in the residential core area and on both sides of the road. The noise and dust pollution caused by the construction will have a certain impact on the urban environment and the normal life of the residents.
其二,传统的现浇混凝土基础施工时需开挖市政设施和放置建筑性材料,必然占用较大施工场地,给交通带来不便,不利于居民的正常出行;
Secondly, the traditional cast-in-situ concrete foundation construction needs to excavate municipal www.buxiugangsanton.cnwww.buxiugangwanto.cnwww.panshiganzaoj.cnwww.ganzaoji.net.cn www.shengwuzhi.net.cnwww.dingjingxiangjiao.cnfacilities and place building materials, which will inevitably occupy a larger construction site, bring inconvenience to traffic, and is not conducive to the normal travel of residents.
其三,按传统方法箱式变压器从基础施工到安装完成一般需要12天左右,施工时间过长,不利于大规模使用;
Thirdly, it usually takes about 12 days for box transformer to be installed according to the traditional method. The construction time is too long, which is not conducive to large-scale use.
其四,传统的现浇混凝土基础在基础开挖、养护期内,如因警示标志不清晰或安全围栏损坏,附近居民、行人误入施工场地,可能造成人身伤害,增加安全风险;其五,如为箱式变压器增容改造工程,停电时间过长,将对居民的基本生活用电造成严重影响。
Fourthly, during the period of foundation excavation and maintenance, if the warning signs are not clear or the safety fence is damaged, the nearby residents and pedestrians may enter the construction site by mistake, which may cause personal injury and increase the safety risk. Fifthly, if the box transformer capacity-increasing renovation project is carried out, the blackout time will be too long, which will seriously affect the basic living electricity consumption of residents.

转让电话